Showing posts with label F-35 (STOVL). Show all posts
Showing posts with label F-35 (STOVL). Show all posts

Tuesday, March 4, 2014

DTN News ~ F-35 CANADIAN CONNECTION: F-35 Makes First Flight Sporting Canadian-Made Tail Wing Assembly

Defense News: DTN News ~ F-35 CANADIAN CONNECTION: F-35 Makes First Flight Sporting Canadian-Made Tail Wing Assembly
*The US Department of Defense (USDOD) has planned to acquire 1,763 F-35As by 2034
Source: DTN News - - This article compiled by K. V. Seth from reliable sources Canadian Manufacturing
(NSI News Source Info) TORONTO, Canada - March 4, 2014: A new F-35 Lightning II fighter jet sporting a Canadian-made tail assembly took to the skies for the first time last month, according to Magellan Aerospace Corp.

The Winnipeg-built tail assembly flew on an F-35A Conventional Take Off and Landing (CTOL) variant from defence giant Lockheed Martin’s final assembly line in Fort Worth, Texas, on Feb. 26.

“Magellan delivered the horizontal tail for the aircraft that flew today in December 2012,” Scott McCrady, Magellan’s F-35 program director, said in a company release.

“Since then our annual production rates have been steadily increasing and are expected to continually increase over the next several years as the F-35 program matures.”

Mississauga, Ont.-based Magellan is under contract with BAE Systems to produce horizontal tail assemblies for the CTOL variant of the F-35 and is expected to produce more than 1,000 assemblies for the program over a 20-year period.

Magellan, under contract with engine maker Rolls-Royce, has also been producing the vane box assembly and transition duct for all of the F-35B Short Take Off and Landing (STOVL) variant of the fighter jet.

The company has also been producing “a number of composite assemblies and machined details” directly to Lockheed Martin.

The F-35A is the conventional take-off and landing (CTOL) variant of the F-35 Joint Strike Fighter (JSF) or F-35 Lightning II fighter aircraft. The single-seat, single-engine fifth-generation F-35A has been designed and is being developed by Lockheed Martin Aeronautics for the US Air Force (USAF) and allied air forces. The multi-role, supersonic, stealthy fighter aircraft is designed to undertake air defence, ground attack and reconnaissance missions.

The F-35A will replace the USAF's F-16 Fighting Falcon fighters and will supersede A-10 Thunderbolt II attack aircraft by 2028. It is also expected to replace F-15 fighters. It addition, the F-35A will complement the F-22 Raptor air superiority fighter.
Design features of the F-35 Lightening II aircraft CTOL edition

The F-35A CTOL variant of the F-35 aircraft is designed mainly as a low-visibility aircraft with air-to-ground attack and air-to-air combat capabilities. Turning agility of the aircraft is nine times the force of gravity.  

The F-35A is more affordable as its operation and support is expected to cost 40%-50% less than current-generation aircraft used by the USAF. Another affordability feature of the aircraft is that approximately 80% of its parts are common to other variants of the F-35 aircraft.

Low visibility capability allows the aircraft to defy, retort and avoid enemy threats. State-of-the-art electronic systems add to the positional awareness of the pilot. Low-radar profile helps in maintaining the aircraft's low visibility by allowing loading of weapons and fuel internally.

Due to its lower logistics footprint, the aircraft can be positioned in an easier way than the USAF's existing fighter aircraft.

Development of Lockheed Martin's fifth-generation fighter aircraft F-35A

The critical design reviews (CDR) for CTOL variant of the F-35 aircraft were conducted in February 2006. The first flight of F-35A was undertaken in December 2006. The initial production order for two F-35A aircraft was sanctioned in April 2007.

A slightly improved version of the original aircraft was flown in November 2009.
The first night flight of F-35A was carried out in January 2012. The aircraft was tested with external weapons for the first time in February that year at Edwards Air Force Base, California. First night re-fuelling mission was completed one month later in March, while the first in-flight re-fuelling mission was completed in April 2012.

Orders and delivery of the CTOL variant of the F-35

In December 2011, the Japanese Air Self-Defence Force selected the CTOL variant to replace its ageing F-4 fleet. Israel has also shown interest in buying at least 100 F-35A aircraft.

The first two production aircraft were handed over to the USAF in May 2011. Two more F-35As were delivered in September 2011. The fifth and sixth aircraft, designated as AF-12 and AF-13 respectively, were delivered to the 33d Fighter Wing at Eglin Air Force Base in October 2011.

The F-35A was initially planned to achieve initial operational capability (IOC) in March 2013. The IOC is now projected to take place in 2016.

The US Department of Defense (USDOD) has planned to acquire 1,763 F-35As by 2034.

Armaments

The F-35A is equipped with an internally-mounted GAU-22/A Equalizer gun manufactured by General Dynamics. This 25mm gun is designed for greater effectiveness against ground targets.

The aircraft's weapon station includes three external pylons on each of the two wings with a combined capacity of 6,800kg. Moreover, there are two internal bays with two pylons each with a combined payload capacity of 8,100kg.

Avionics

Northrop Grumman Electronic Systems is supplying its AN/APG-81 Active Electronically Scanned Array (AESA) radar for the aircraft. The company is also supplying the AN/AAQ-37 Distributed Aperture System (DAS) missile warning system, which is fitted with six electro-optical sensors.

An electronic warfare suite, designated as AN/ASQ-239, will be supplied by BAE Systems. Multifunction Advanced Data Link (MADL) communication system will be provided by Harris Corporation.

Performance

The 15.7m F-35A aircraft can fly at a maximum speed of 1.6 Mach. The combat radius and maximum range of the aircraft on internal fuel are 1,093km and 2,200km respectively. Maximum g-rating of F-35A is 9.0 and weapons payload capacity is 8,160kg.
Pratt & Whitney engine for the F-35A fighter aircraft

The F-35A CTOL is powered by a single F135 engine (F135-PW-100 variant) manufactured by Pratt & Whitney. The F135 is a two-spool afterburning turbofan type engine capable of producing maximum thrust of 191.3kN and intermediate thrust of 128.1kN.

The F135 engine is an enhanced version of the F119 engine which powers the F-22 Raptor. F135 measures 135m in length and has an inner diameter of 1.17m. Overall pressure ratio of the engine is 28. Internal fuel capacity is 8,382kg.

*Link for This article compiled by K. V. Seth from reliable sources Canadian Manufacturing
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*Photograph: IPF (International Pool of Friends) + DTN News / otherwise source stated
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Saturday, September 28, 2013

DTN News - DEFENSE NEWS: US DoD Has Awarded Contracts To Lockheed Martin For F-35 JSF Aircrafts

Defense News: DTN News - DEFENSE NEWS: US DoD Has Awarded Contracts To Lockheed Martin For F-35 JSF Aircrafts
Source: DTN News - - This article compiled by K. V. Seth from reliable sources U.S. DoD #691-13 Dated September 27, 2013 + Baynet.com
(NSI News Source Info) TORONTO, Canada - September 28, 2013: The U.S. Department of Defense and Lockheed Martin signed two F-35 contracts today, valued at $7.8 billion, for a total of 71 F-35 Lightning II aircraft to be produced in the sixth and seventh Low-Rate Initial Production (LRIP) lots. These agreements are a significant milestone for the F-35 Program, and reflect cost reduction initiatives shared by government and industry.
The LRIP 6 contract, valued at $4.4 billion ($3.7 billion awarded through a December 2012 undefinitized contract action; ref: N00019-11-C-0083, and $0.7 billion awarded through today’s contract) funds production of 36 aircraft, with average aircraft unit cost approximately 2.5 percent lower than LRIP 5 aircraft. LRIP 6 per variant unit prices (not including engine cost) follow:

·   23 F-35As CTOL - $103 million/jet

·   6 F-35B STOVL - $109 million/jet

·   7 F-35C CV - $120 million/jet

The LRIP 7 contract, valued at $3.4 billion, funds the production of 35 aircraft, with average aircraft unit cost approximately 6 percent lower than LRIP 5 aircraft. F-35 LRIP 7 per variant unit prices (not including engine cost) follow: 

·   24 F-35As CTOL - $98 million/jet

·   7 F-35B STOVL - $104 million/jet

·   4 F-35C CV - $116 million/jet

The 71 aircraft are currently in various stages of production. Lockheed Martin will begin delivering LRIP 6 aircraft in the second quarter of 2014 and LRIP 7 jets in the second quarter of 2015. LRIP 6 will mark the first delivery of international F-35 jets for Italy and Australia, and LRIP 7 will mark the first delivery to Norway.

 The LRIP 6 and 7 contract terms reduce the government’s exposure to target cost overruns relative to previous LRIP contracts. In the LRIP 6 and 7 buy, Lockheed Martin will cover all cost overruns. The government and Lockheed Martin will share returns (20/80) derived from any under runs in target cost.

 The LRIP 6 and 7 contracts contain performance-based payments, whereby the contractor will receive incremental payment as measured goals are achieved along the production line until government aircraft acceptance. LRIP 6 and 7 contracts also include a concurrency clause which requires Lockheed Martin to share costs equally with the government (50/50) for known concurrency changes arising from System Development and Demonstration testing and qualification. Newly discovered concurrency changes identified during LRIP 6 and 7 production periods will be authorized via engineering change proposals.

F-35 engines are funded through separate contract actions with Pratt & Whitney.

Lorraine Martin, VP and GM of the F-35 Program, said about the contracts “Lockheed Martin is extremely pleased with the LRIP 6 and 7 contract signing, which represents a significant milestone for the F-35 Program and its path to enhanced affordability. With each successive production lot, unit costs have declined. That’s a trend we look forward to continuing as this program moves toward full rate production and operational maturity. Working together with the Joint Program Office, our entire industrial team is focused on delivering the F-35’s 5th generation capabilities to our Armed Forces and partner nations at a 4th generation price point.”

U.S. DoD #691-13 Dated September 27, 2013
Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $3,405,427,661 modification with fixed-price-incentive-firm, cost-plus-fixed-fee, and cost-plus-incentive-fee line items to a previously awarded advance acquisition contract (N00019-12-C-0004) for Low Rate Initial Production (LRIP) Lot VII F-35 Lightning II Joint Strike Fighter aircraft production. This modification provides for the manufacture and delivery of 19 F-35 Conventional Take-Off and Landing (CTOL) for the U.S. Air Force; six F-35 Short Take-Off and Vertical Landing (STOVL) aircraft for the U.S. Marine Corps; four F-35 Carrier Variant (CV) aircraft for the U.S. Navy; two F-35 CTOL aircraft for Norway; three F-35 CTOL aircraft for Italy; and one (1) F-35 STOVL for the United Kingdom. This modification also provides for LRIP Lot 7 production requirements, including manufacturing support equipment, diminishing manufacturing sources management, ancillary mission equipment, including Pilot Flight Equipment, and concurrency changes to LRIP Lot 7 aircraft for the U.S. Air Force, U.S. Marine Corps, and U.S. Navy, and for non-U.S. DoD Participants in the F-35 Program. Concurrency changes are changes to the LRIP Lot 7 configuration baseline resulting from the F-35 development effort. Work will be performed in Fort Worth, Texas (55 percent); El Segundo, Calif. (15 percent); Warton, United Kingdom (10 percent); Orlando, Fla. (5 percent); Nashua, N.H. (5 percent); Baltimore, Md. (5 percent), and Cameri, Italy (5 percent). Aircraft deliveries are expected to be completed in October 2016. Fiscal 2013 Aircraft Procurement, Air Force; Fiscal 2013 Aircraft Procurement Navy; and International Partner funding in the amount of $3,405,427,661 are being obligated on this award, none of which will expire at the end of the current fiscal year. This contract combines purchases for the U.S. Air Force ($1,823,737,540; 53.55 percent), U.S. Marine Corps ($567,802,742; 16.67 percent), the U.S. Navy ($401,457,402; 11.79 percent); and the Governments of Italy, Norway, United Kingdom, Australia, Turkey, the Netherlands, Canada, and Denmark ($612,429,977; 34.46 percent) The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.

Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $742,657,068 cost-plus-fixed-fee, cost-plus-incentive-fee, fixed-price-incentive (firm target) modification to the previously awarded F-35 Lightning II Low Rate Initial Production Lot VI advance acquisition contract (N00019-11-C-0083). This modification provides for the manufacture and delivery of two F-35 Conventional Take-Off and Landing (CTOL) aircraft for the Government of Australia and three F-35 CTOL aircraft for the Government of Italy. In addition, this modification provides for LRIP Lot VI production requirements, including manufacturing support equipment, diminishing manufacturing sources management, ancillary mission equipment including pilot flight equipment, and concurrency changes to LRIP Lot VI aircraft for the U.S. Air Force, U.S. Marine Corps, the U.S. Navy, and the non-U.S. DoD Participants in the F-35 Program. Concurrency changes are changes to the LRIP Lot VI configuration baseline resulting from the F-35 development effort. Work will be performed in Fort Worth, Texas (55 percent); El Segundo, Calif. (15 percent); Warton, United Kingdom (10 percent); Orlando, Fla. (5 percent); Nashua, N.H. (5 percent); Baltimore, Md. (5 percent); and Cameri, Italy (5 percent), and is expected to be completed in April 2016. Fiscal 2012 and 2013 Aircraft Procurement, Air Force; Fiscal 2012 Aircraft Procurement, Navy; and International Partner funding in the amount of $742,657,068 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This modification combines purchases for the U.S. Air Force ($130,677,491; 17.60 percent); the U.S. Navy/Marine Corps ($66,199,572; 8.92 percent); and the Governments of Italy, Australia, United Kingdom, Turkey, the Netherlands, Canada, Norway and Denmark ($545,780,005; 73.49 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.
*Link for This article compiled by K. V. Seth - DTN News from reliable sources U.S. DoD #691-13 Dated September 27, 2013 + Baynet.com
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*Photograph: IPF (International Pool of Friends) + DTN News / otherwise source stated
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS

Sunday, February 12, 2012

DTN News - DEFENSE NEWS: Italy Widely Expected To Scale Back F-35 Orders

Defense News: DTN News - DEFENSE NEWS: Italy Widely Expected To Scale Back F-35 Orders
* Cabinet to review defence spending cuts Tuesday -govt source
* Italian defense minister to outline cuts to lawmakers Wednesday
* Italy to cut order to 100 from 131 -newspaper
Source: DTN News - - This article compiled by Roger Smith from reliable sources By Steve Scherer - Reuters
 (NSI News Source Info) TORONTO, Canada - February 12, 2012:  Italy seems certain to scale back its major investment in Lockheed Martin Corp's F-35 Joint Strike Fighter, heightening uncertainty over the troubled stealth jet's future.

Defence Minister Giampaolo Di Paola has said repeatedly since January that the country's originally planned order of the 131 supersonic warplanes by 2018 was being "reviewed" because military spending cuts were necessary as part of Prime Minister Mario Monti's austerity plan to shore up public accounts.
General Claudio Debertolis, secretary general of the Defence Ministry and the country's armaments chief, confirmed to lawmakers on Tuesday that cuts were expected.

"There will be a revision of this Joint Strike Fighter programme to align it with disposable resources," he said.

Italy will ask for about 30 fewer planes, Corriere della Sera daily reported on Friday, without citing its source. Panorama magazine gave the same number on Jan. 18.

Government sources and lawmakers told Reuters that it was premature to say how many of the F-35 fighters Italy will order because of uncertainty over the version of the aircraft designed for short take-off and vertical landing (STOVL).

This version is supposed to replace ageing Harrier jets on Italy's new hi-tech Cavour aircraft carrier.

On Tuesday Monti's Cabinet will examine the Defence Ministry's new spending plan that includes reducing F-35 outlays and personnel cuts, according to a government source. The minister will then detail the package to parliament on Wednesday.

The Pentagon's F-35 program office declined comment on Italy's plans, saying all of the partner countries would meet in Australia in March to discuss their production plans.

PENTAGON CUTS

Uncertainty over the Pentagon's most expensive current arms programme is growing as participating countries cut or postpone orders, and flight testing continues.

Washington is expected to announce on Monday that it will postpone production of 179 planes over the next five years, bringing the total that would have been ordered between 2013 and 2017 down to 244 from 423.

In January the Pentagon announced $487 billion in defence cuts over the next decade.

"It's reasonable to do what the American government is doing, reduce the number of orders and spread them out over a longer time frame," said Federica Mogherini, secretary of the Italian Chamber of Deputies' defense committee and a member of the centre-left Democratic Party, the second-biggest bloc supporting Monti's technocrat government in parliament.

"It's not yet necessary to establish total number of planes we will order because costs are evolving, and all the technical problems have yet to be resolved," she told Reuters.

Some of the most significant technical problems concern the short take-off model, which has had engine trouble, and needed an early redesign due to excess weight. Recently, there were concerns about metal fatigue in a bulkhead, overheating of parts, and excess vibration in doors for an air input port.

Only the United States and Italy have so far said they plan to buy the STOVL version of the aircraft.

Australia has also said it is rethinking its plan to buy 12 of the radar-evading jets, and Turkey has put off buying two of them. Britain said earlier this month that it won't make a firm commitment on the number of planes until 2015. The other partners in joint construction of the plane are Denmark, Norway, the Netherlands, and Canada.

Italy is the third investor in the programme after the United States and Britain. Italy is in the process of ordering its first three planes for $240 million, Debertolis said on Tuesday.

Centre-left lawmakers called for defence cuts as Monti's "Save Italy" austerity measures kicked in this year, hitting Italians with smaller pensions and higher fuel costs, property and sales taxes aimed at eliminating the budget deficit by 2013.

Two newspapers aligned with the centre-left Democratic Party criticized spending on the F-35 jet programme in a series of articles during the first half of January.

State-owned Finmeccanica is one of the subcontractors on the project. Finmeccanica's Alenia unit will assemble the planes purchased by Italy, the Netherlands and Norway.

"Even if the order we make is much lower than 131 we started with, Italy's work on the aircraft is still guaranteed," Debertolis told lawmakers. "We could have a significant decrease in orders and still keep Italy's industrial role intact."

Related News:
*Link for This article compiled by Roger Smith from reliable sources By Steve Scherer  - Reuters
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS 

Friday, February 10, 2012

DTN News - DEFENSE NEWS: U.S. DoD Awarded Contract To Lockheed Martin Related To F-35 JSF For Marine Corps

Defense News: DTN News - DEFENSE NEWS: U.S. DoD Awarded Contract To Lockheed Martin Related To F-35 JSF For Marine Corps
Source: DTN News - - This article compiled by Roger Smith from reliable sources DTN News & U.S. DoD February 9, 2010
(NSI News Source Info) TORONTO, Canada - February 10, 2012: Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $14,800,000 modification to a previously awarded advance acquisition contract (N00019-11-C-0083) to procure long lead items for F-35 Lightning II Joint Strike Fighter low rate initial production Lot 6 short take-off vertical landing (STOVL) aircraft for the Marine Corps. 
Work will be performed in Fort Worth, Texas, and is necessary to protect the delivery schedules of STOVL aircraft planned for delivery through December 2014.  Contract funds will not expire at the end of the current fiscal year.  

The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.

*Link for This article compiled by Roger Smith from reliable sources DTN News & U.S. DoD February 9, 2010
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS 

Saturday, January 21, 2012

DTN News - DEFENSE NEWS: Panetta Lifts F-35 Fighter Variant Probation

Defense News:  DTN News - DEFENSE NEWS:  Panetta Lifts F-35 Fighter Variant Probation
Source: DTN News - - This article compiled by Roger Smith from reliable sources By Army Sgt. 1st Class Tyrone C. Marshall Jr. - American Forces Press Service
 (NSI News Source Info) TORONTO, Canada - January 21, 2012:  Defense Secretary Leon E. Panetta announced today he’s lifted probation from the Short Takeoff, Vertical Landing variant of the fifth generation F-35 Lightning II joint strike fighter which is absolutely vital to maintaining air superiority.


Click photo for screen-resolution image
Defense Secretary Leon E. Panetta and U.S. Rep. Steny H. Hoyer of Maryland look at the cockpit of the F-35 Joint Strike Fighter with Navy Capt. Erik "Rock" Etz on Naval Air Station Patuxent River, Md., Jan. 20, 2012. Panetta and Hoyer toured several facilities related to the F-35 Joint Strike Fighter, which is in its test phases at the base. DOD photo by Erin A. Kirk-Cuomo 

(Click photo for screen-resolution image);high-resolution image available
.
Speaking during a town hall-style meeting here, the defense secretary discussed the latest development in the progress of the joint strike fighter program as service members, politicians and the civilian workforce listened.

“Early in 2011 DOD was compelled to put [the Short Takeoff and Vertical Landing] … on probation,” he said.
“Over the course of last year, you here at Pax River helped make an incredible difference by completing tremendous amounts of STOVL testing,” Panetta noted. “You demonstrated that we've made real progress towards fixing some of the known problems that we had with STOVL.”
Panetta lauded the joint strike fighter’s workforce at NAS Patuxent River for their efforts to bring the STOVL variant up to the standards of the two other existing versions of the F-35, the Conventional Takeoff and Landing and Carrier Variant.
“We now believe that because of your work, that the STOVL variant is demonstrating the kind of performance and maturity that is in line with the other two variants of the JSF,” Panetta said.
“As a result of your hard work and the hard work of JSF's government and industry team … the STOVL variant has made, I believe and all of us believe, sufficient progress so that as of today, I am lifting the STOVL probation,” he announced.
Panetta commended the crowd for their hard work, but cautioned that the JSF program still has more work to do. “We've got a long way to go with the JSF testing, and it's obviously not out of the woods yet,” he said.
“But I am confident that if we continue to do the hard work necessary … that both the Carrier and the STOVL Variant are going to be ready for operations and are going to be ready for doing the work that they have to do, which is to help protect this country,” Panetta said.
“I want you all to know that as secretary of defense, my department is committed to the development of the F-35,” he said. “It's absolutely critical … that we get it right. And that's why you're here. The developmental testing that's going on here will ensure that we get this right.”
Marine Corps Commandant Gen. James F. Amos called Panetta’s decision to lift the probation of the F-35B “hard-earned.”
“Secretary Panetta’s decision to take the F-35B Lightning II Short Takeoff, Vertical Landing variant off probation was a hard-earned and rewarding announcement for the entire DOD/industry team that worked very hard last year,” he said.
“Successful F-35B performance ashore and at sea has very positively advanced the state of demonstrated capability in 2011,” Amos said. “The positive momentum generated during 2011 will continue as testing proceeds, production aircraft are delivered, and fleet training begins in 2012.”
Panetta said it is important that the U.S. military maintains its technological edge into the future.
“That's where we have to be,” he said. “We're going to have a strong defense; we have got to be there.”
Panetta praised the capabilities of Patuxent’s workforce.
“Because of you, because of the very unique testing and capabilities that are offered here, we are able to maintain that technological edge,” Panetta said. “And I want to thank you again for your dedication, for your commitment, for your great skills.”
Panetta lauded the Patuxent River installation calling it “a very unique facility” and “a national treasure” that is important to maintain.
“These are world-class facilities … that [are] important to our military, important to our men and women in uniform who have to put their lives on the line, and it's important to our national security,” Panetta said.
“Please accept my deepest thanks for your work and dedication,” he said. “I couldn't do it without you.”

*Link for This article compiled by Roger Smith from reliable sources By Army Sgt. 1st Class Tyrone C. Marshall Jr. - American Forces Press Service
*Speaking Image - Creation of DTN News ~ Defense Technology News 
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News Contact:dtnnews@ymail.com 
©COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS 

Sunday, December 11, 2011

DTN News - LOCKHEED MARTIN DEFENSE NEWS: Lockheed - Pentagon Order For F-35s Undefinitized

Defense News: DTN News - LOCKHEED MARTIN DEFENSE NEWS: Lockheed - Pentagon Order For F-35s Undefinitized
(NSI News Source Info) TORONTO, Canada - December 10, 2011: Lockheed Martin has signed an undefinitized contract that establishes a price ceiling for the fifth low rate production lot for the F-35 Lightning II Joint Strike Fighter, company officials clarified late on Dec. 10.

The Pentagon announced earlier on Dec. 10 that it had awarded Lockheed Martin a $4 billion contract to build 30 F-35 Joint Strike Fighter aircraft for the U.S. Air Force, Navy, andMarine Corps.

"Lockheed Martin has signed an undefinitized contract that establishes the funding for Lot 5 up to the level announced by the DoD today," said Lockheed Martin spokeswoman Laurie Quincy in an email. "The final Lot 5 contract amount will not be known until we have a definitized contract sometime in 2012."

She said in a statement that the award is welcome news for the company and its F-35 suppliers.

"This … will help ensure we continue to meet production schedules outlined by the program," Quincy wrote. "This is an important first step in paving the way for full LRIP 5 production contract negotiations with our government customer."

The fixed-price-incentive contract calls for 21 F-35A conventional take off and landing (CTOL) for the Air Force, three F-35B short-take off and vertical landing (STOVL) aircraft for the Marines, and six F-35C carrier variants for the Navy.

Broken down by service, two-thirds of the value of the contract - $2.65 billion - is for the Air Force; $937 million, or 23 percent, for the Navy; and $426 million, or nearly 11 percent, for the Marine Corps.

The contract also provides for "associated ancillary mission equipment and flight test instrumentation" for the planes, and flight test instrumentation for the United Kingdom.

The contract was awarded through the Naval Air Systems Command.

The next-generation F-35 is a stealthy (radar-evading), supersonic multirole fighter designed to meet the U.S. government's requirements for a new generation of transformational weapons. The single-engine JSF will be manufactured in three versions: a conventional-takeoff-and-landing (CTOL) variant for the U.S. Air Force, an aircraft-carrier version (CV) for the U.S. Navy, and a short-takeoff/vertical landing (STOVL) version for the U.S. Marine Corps.

The cornerstone of the F-35 is affordability, achieved in large part through a very high level of common parts and systems across the three versions of the aircraft.

The F-35 is designed to replace aging fighter inventories, including U.S. Air Force A-10s and F-16s, U.S. Navy F/A-18s, U.S. Marine Corps AV-8B Harriers and F/A-18s, and United Kingdom Harrier GR.7s and Sea Harriers.


*Speaking Image - Creation of DTN News ~ Defense Technology News
*This article is being posted from Toronto, Canada By DTN News ~ Defense-Technology News

©

COPYRIGHT (C) DTN NEWS DEFENSE-TECHNOLOGY NEWS